For NSR NVR-3000 there is free space on the console, close to the main magnetic compass. Before ordering mounts, establish whether the existing compass arrangement design covers the new equipment and what information is needed to assess its magnetic influence. The available console space only tells you whether the enclosure will fit.

Request a quote

Generic magnetic compass and separate radio station on a bridge. The illustration gives no dimensions or safe clearance.
Illustration of the proposed arrangement. The distance shown is not a mounting dimension or evidence of acceptable magnetic influence.

Where the cited clauses apply

This example uses Part V, Navigational Equipment, of the Russian Maritime Register of Shipping (RS) Rules for the Equipment of Sea-Going Ships, edition of 1 January 2026. Under clause 1.1.1 it applies to self-propelled ships not engaged in international voyages and to the relevant equipment. Clause 1.1.3 provides for additional instructions from the flag Administration. Determine applicability separately for other vessels.

The issue concerns bridge equipment placement and the magnetic compass. A satellite or gyro heading source does not remove the need to consider the installed main magnetic compass where the requirements apply.

The limit applies to the equipment as a whole

Clause 3.1.2 requires bridge navigational instruments, devices, cables and other equipment to be arranged so that their magnetic fields do not affect the main magnetic compass reading by more than ±0.5°.

The rule covers several types of equipment. For a retrofit, describe the new central unit and anything nearby that changes, such as the power supply, remote speaker and cable routes. The actual design determines what must be assessed. These are examples of information to collect.

The limit does not specify a universal clearance in centimetres. A fixed separation for every radio cannot be derived from it. The responsible specialist needs details of the particular product and proposed placement to carry out the required assessment.

When approval is required

Clause 3.4.1.4 addresses objects installed near the main magnetic compass that were not provided for in the original compass arrangement design. Such installation is permitted only with Register approval. The clause also refers to 3.1.2.

Start by comparing the existing design with the proposed change. If the purpose or location of earlier equipment is unknown, record it as an open survey question. Whether the new device is lighter or newer does not determine the approval process.

What to attach to a request for a new workstation

Background informationWhy it is needed
Bridge plan and position of the main magnetic compassShow the proposed arrangement
Existing compass arrangement designIdentify what the original design provided for
Full designations of new and retained unitsCompare the documents for the specific equipment
Changes to power, speakers and cable routesDefine the actual scope of the retrofit
Existing compass observations and recordsGive the responsible specialist a record of the existing arrangement

General photographs and photographs of markings supplement the drawing. They cannot establish the magnitude of the magnetic influence or replace the required check. The applicable documents and responsible specialist determine the method and how to record the result.

How to include this in a quotation

For NVR-3000 describe the workstation functions and show the proposed location. Ask for a breakdown of equipment, accessories and work required for the agreed change. If the compass proximity has yet to be assessed, keep it as an open item until the location is finalised.

The catalogue listing identifies the item for discussion. The quotation confirms documentation, version, condition, availability and price. The suitability of the position on this bridge is determined as part of the installation design.