RG58 SMA-N 10 m: what to check before buying a router cable

RG58 SMA-male - N-male, 10 m - image of our catalog position. configuration, completeness and number of products are confirmed in the quotation.
Request price and set RG58 SMA-male - N-male, 10 mBuy RG58 10 m assembly with SMA-male and N-male: port compatibility, route length, operating frequency losses and outdoor connection.
Two connectors must correspond to two ports.
In our heading is a ten-meter RG58 assembly with SMA-male and N-male. It is convenient for a task in which both ends fit the antenna and equipment. Check each port separately before purchasing. SMA and RP-SMA may have similar threads at a different central contact; matching appearance does not confirm the desired connection. Large photos of connectors and exact models of devices are suitable for the request. If there are several antenna nests nearby, specify the destination of the router selected according to the documentation.
Ten meters is not a universal recommendation.
The assembly is selected for the measured track. Excess cable does not create additional gain: losses depend on the length and operating frequency. Convenient length for installation should be compatible with the allowable losses of the entire tract. For an accurate assessment, information about the cable of a particular assembly, connectors and equipment range is needed. With a high frequency or a long route, it makes sense to compare another cable or other equipment placement. Fixed attenuation cannot be considered the same for all RG58 variants and all frequencies.
Example of coordination with AL-800/2700-8
The manufacturer of the AL-800/2700-8 specifies N-female, so N-male is considered as the appropriate type of response. But this check does not end: at the second end, the router must have a suitable SMA port, and the number of antenna paths is agreed separately. One assembly connects one path. If the equipment requires two antennas for the intended circuit, this is reflected in the order by the number of independent lines. Do not use a mechanically suitable cable as proof of support for all antenna ranges and devices.
Installation and acceptance of finished assembly
Find out what part of the line will be outside, where the input is located and how the joints will be protected. The cable is fixed without load on the hardware connector; the stock is not clamped with a door or a sharp edge. Outdoor operating conditions are confirmed for a specific assembly. Upon receipt, the length, marking and contacts are checked, then work with the same equipment and operator is checked. In the order, it is useful to specify what exactly is sold in one position: a ten-meter assembly, and not an antenna with a router. The main cable card is placed first in the selection below.
| What to agree on | Order data |
|---|---|
| Catalog assembly | RG58, 10m, SMA-male - N-male |
| First port | Antenna: type, contact and conditions of the external joint |
| Second port | Router: SMA or RP-SMA, Nest Assignment |
| The result | Suitable length and allowable losses at the operating frequency |
Price and delivery to your city
To buy RG58 SMA-male - N-male, 10 m, send the quantity, description of the equipment and the receipt address. The request can be specified Samara, Ufa, Tyumen, Aktobe and Atyrau or another city of Russia and Kazakhstan. The cost, current availability, condition, set and term are confirmed in the quotation for your address.
Questions before buying
Can SMA-male be connected to any RP-SMA?
Nope. The thread and central contact of each connection are checked.
Does one build serve two MIMO ports?
It's one cable line. The number of lines is selected according to the antenna circuit of the equipment.
How to order without errors with ports?
Send antenna and router models, photos of both ports and the length of the actual route.
Main product and related items
The main product from the technical guide is listed first. The links lead to our group's own Sea River catalog. Related items are discussed separately; compatibility and composition are confirmed by task and documentation.


